Assalamualaikum..hye...we meet again in my virtual blog....hehehe....now..i would like to let all know abaut our project 6 which consist of 6A ( Amphitheatre stage design) , 6B (final report) and 6C ( model estimation)..On 22 of November we the project was issued..we got about 6 weeks to complete our work until project 6C...the first four weeks for project 6A and 6B and the next 2 weeks for project 6C....

Week 1

On the first week after we got this project, my groups which consist of 16 members including architects students, construction manager students, planning students, quantity surveyor students, building surveyor student, interior design students and building technology students. We devide our task according to our major.For the first week, we are visiting our site and we must submit our weekly progress report to our new studiomaster Dr. Suraiyati.

                                           Figure 1: Alternative way to the site


                                                  Figure 2: The way to the site


                                                      The stairs from main way to site


                                                      Upper view to the site


                                                                        he site


                                                    Night View at the site of stage 


                                              The lighting at the site at night


                                            The site for stage amphiteathre


                                                        Alternative road to the site


                                                    Vegetation: palm species near the site


Week 2

Moving to the next week,this week is the mid semester break...so the progress of our group is to make the design of the stage....so our caliber architecture students and also interior design students come out with a few unique simple design.



                                                             sketch of the design


                                                           Sketch of the design


                                           
                                                           Sketch Of the design


                                                        Conceptual Of the Design


                                                           The Bubble diagram sketch
                                                        The Design sketch


                                                               The design sketch


                                                               The Design Sketch


                                                          The design sketch


                                                         The design sketch

Week 3

This week, we done for our finalize design...our concept is wave which means wave transform energy phenomenon.This mean that our objective in spreading any information or show making are spread evenly to all of audiance besides it is a symbol of Penang which is an island.so, we finalize our design this week.


                                                           The design choosen


                                                           Our wave concept
                                                         Some model making


                                                              Model Choosen



Week 4

This is the last week for project 6A and 6B,....so this week we in teamwork, struggle to finish our work on final report and the design drawing......we are helping each other and this are best moment....then alhamdulillah we finish our work successfully.we submit and present our teamwork in RUS 104 class at DKE48 B......we got some comment about the vegetation size.




                                                      The first Drawing: elevation




   
                                                             Site analysis


                                                               Perspective drawings

                                                     Site Plan and conceptual




Week 5

Alhamdulillah...after we submit our project 6A and 6B...we continue our project with project 6B and also amphiteathre stage making...for this week,...as quantity surveyor students me and Liko making the preliminary model estimation and according to that we buy the material needed to complete our work in stage making model next week..we surveyed about the price of material before buy it as we have to make our preliminary model estimation.

                                                                     Battery




Battery


                                                                       lamp
                                                                     Lamp




                                                                   Wire
                                                                         Connecting wire


                                                                       Menthol


                                                  Our preleminary model estimation report

          









Week 6


This is the last week we done for project 6.....alhamdulillah in team, we complete our work sucessfully and we going to have fun while working and got to see our teamwork.....we also done for actual model costing and also for elementary estimation....thanks to our God...

                                                     My Beloved teammates....I love you all





                                                                 Our Stage is done



                                                                   Actual Model estimation










                                                                  Elementary estimation